Scope creep rarely arrives as a dramatic request. It shows up as one more page, one more round of feedback, one quick call, one small change. The fix is not to become rigid. It is to make the original shape of the work visible enough that a change has somewhere to land.
Use an “included / outside” sentence
After listing your deliverables, add one plain sentence: “This quote includes [the agreed work]. Anything outside that list will be scoped and quoted separately before it begins.”
Be specific about revisions
“Revisions included” is a useful start, but it leaves room for interpretation. Name the number of rounds and what a round means. A round is usually a consolidated set of feedback, not one comment arriving every afternoon for two weeks.
Turn changes into choices
When a new request appears, respond with a choice rather than a warning: “That is a useful addition. We can swap it for the current launch item, or I can quote it as a second phase.” You are protecting the plan while keeping the relationship collaborative.